Watchdog: Pentagon’s $31 Billion F-35 Parts Inventory Still Unreliable

The Pentagon’s ability to track its vast stockpile of F-35 parts remains compromised, according to a new congressional watchdog report that raises fresh concerns about the F-35 parts inventory. The Government Accountability Office found that the F-35 Joint Program Office still cannot determine the status of more than 1 million components valued at over $85 million—losses the GAO first flagged in 2023.

A Persistent Accounting Gap

A US F-35C jet takes off from an aircraft carrier.

As of March 2026, the program office had not resolved the status of those previously identified missing parts, the GAO said. Worse, officials could not say whether more recent loss reports might include any of the same components, leaving open the possibility that the same items are being counted twice or not at all.

The Pentagon owns roughly 26 million F-35 parts with an estimated value of $31 billion. These are dispersed across more than 700 facilities, about 70% of them government-managed and 30% contractor-managed. That split adds complexity to an already difficult inventory challenge.

Why the Data Falls Short

A US F-35A jet sits on tarmac at sunset.

At the heart of the problem is the Enterprise Logistics Management System, or ELMS. The GAO found that ELMS pulls data from a mix of sources and does not reflect real-time changes in part status. A key limitation is the system’s inability to connect directly to prime contractor systems, which prevents the program office from maintaining a complete and current .

The report also identified gaps in official records. As of March 2026, roughly 17,000 parts worth about $1.3 billion were undergoing maintenance or repair but had not been entered into the program’s official system. Officials told the GAO that the value could reach as high as $2.5 billion once transportation and overhead costs are included.

“The data are not reliable for asset accountability or financial reporting,” the GAO concluded about the information in ELMS, adding that timely and accurate parts data is essential for meeting warfighter needs.

Inventory Efforts Fall Short

Since 2020, the F-35 Joint Program Office has spent at least $17 million on physical inventories at both contractor- and government-managed facilities. The GAO found that these efforts have not adequately resolved the underlying problems.

“Until the interfaces with contractors’ systems are established and effective validation procedures to ensure data quality are implemented, DoD will not have accurate information about where its F-35 parts are located, what their value is, and how many there are,” the report stated.

The Department of Defense concurred with the GAO’s recommendations. A Joint Program Office spokesperson said the department is implementing specific actions to monitor and analyze loss trends and is developing program-specific procedures and training for Accountable Property Officers.

Readiness and Cost Pressures

The inventory problems come amid broader sustainment challenges for the F-35, the most expensive weapon system program in history. Earlier this year, the GAO reported that the aircraft’s mission-capable rate—the share of time it can perform at least one mission—dropped from 67% in fiscal year 2021 to 44% in fiscal year 2025. The full mission-capable rate, which measures the ability to perform all assigned missions, fell from 38% to 25% over the same period.

The GAO identified spare parts shortages and maintenance issues as contributors to the readiness decline. The Pentagon launched a $13.7 billion readiness plan last year aimed at improving aircraft availability by the end of the decade, though that investment could end up costing more than expected.

The latest report warns that unreliable inventory records could make it difficult to determine which parts the program needs and in what quantities—a problem that could ripple through both readiness and finances. The US operates three variants of the F-35: the F-35A for conventional runways, the F-35B for short takeoffs and vertical landings, and the F-35C for carrier operations.

For now, the GAO’s findings suggest that without reliable data, the Pentagon cannot fully account for where its F-35 parts are, what they are worth, or how many exist—a gap with implications for both warfighting readiness and taxpayer dollars.